Site studies, sustainable masterplanning, approvals and green certification, and building performance — delivered by one accountable team, from the first site visit to the finished building.
One project lead across every stage
India is building at a scale and speed the world has not seen. Land, water and ecology set the limits of every project — but they are usually studied last, by consultants who never speak to each other, and then re-studied for every approval. We study them first, and together, then carry the same evidence through planning, approvals and certification — so developers get one integrated answer and one point of accountability.
Environmental questions answered late cost a redesign, and an approval refused costs months. We bring them forward: the site study shapes the plan, the plan carries the approvals, and the approved design is built to perform.
Plan a residential community around the land’s natural water systems rather than against them.
Watershed mapping of the whole site; percolation tanks and reservoirs; interconnected water bodies across plots; bio-swales with runoff calculations and drain sizing; plant-based wastewater reuse; solar potential mapping and low-energy design for thermal comfort.
Professional training in building performance simulation, compliance modelling and analysis, taught by the practitioners who run BEI projects and calibrated for Indian climate zones and frameworks.
Explore BEI Academy →Our international work runs through Green Grid Designs Advisory FZ-LLC, a RAKEZ-registered UAE entity covering sustainability and building performance advisory across the Gulf. Same practitioners, same methodology.
GGD Advisory UAE →From a single site study to approvals and a full building performance programme. Scope and approach confirmed within 24 hours.