Approvals usually run as separate tracks with separate consultants, each asking for the same site data. We run them together: the baseline, hydrology and ecology work from Stage 01 becomes the evidence base, and green rating strategy is set alongside statutory approvals so nothing is studied twice.
Building, construction, township and area development projects above state-defined size thresholds need environmental clearance, generally appraised at state level. We scope what your project triggers, prepare the supporting studies and documentation, and manage the process through to authority queries.
Clearance thresholds and procedures depend on project type, size and state, and are periodically amended. We confirm what applies to your site before any scope is agreed.
Coastal and tidal-influenced sites fall under the Coastal Regulation Zone framework, with recommendations from the state coastal zone management authority. We assess where the site sits, what is permitted, and prepare the supporting studies and documentation.
Many developments, hotels and industrial facilities need Consent to Establish before construction and Consent to Operate before occupation from the State Pollution Control Board. We prepare the documentation, including wastewater, waste and emissions details.
Groundwater abstraction and tree removal or transplantation each have their own permissions. Our hydrology and ecology studies provide the evidence these applications need.
Voluntary green ratings, from design-stage pre-certification through to final rating. We select the right system, set the credit strategy early, run the simulations, and manage documentation and submission — including the incentive pathways some states and municipal bodies offer for rated buildings.
Energy conservation building code compliance for commercial and residential projects, prepared in the format each state authority expects at submission.
Which approvals and ratings usually come into play for each type of project. Click a column heading to see how we support it.
| Project type | Environmental clearance | CRZ clearance | CTE / CTO | Groundwater & trees | Green rating | Energy code |
|---|---|---|---|---|---|---|
| Resort & hospitality | Size-dependent Above state thresholds | If applicable Coastal or tidal sites | Usually Hotels and STPs | If applicable Borewells, tree removal | Optional Often brand-driven | If applicable Where notified |
| Township & plotted development | Size-dependent Area and built-up thresholds | If applicable Coastal or tidal sites | Usually Common for large schemes | If applicable Borewells, tree removal | Optional Township ratings; incentives | If applicable Where notified |
| Commercial & mixed-use building | Size-dependent Above built-up threshold | If applicable Coastal or tidal sites | Size-dependent Depends on size and state | If applicable Borewells, tree removal | Optional Tenant and lender demand | If applicable Where notified |
| Industrial facility | Activity-based By industry category | If applicable Coastal or tidal sites | Usually Most categories | If applicable Water-intensive processes | Optional Green factory ratings | If applicable Where notified |
| Villa & small residential | Rarely Below thresholds | If applicable Coastal or tidal sites | Rarely Generally not | If applicable Borewells, tree removal | Optional SVAGRIHA, IGBC Homes | If applicable Residential code, where notified |
This matrix is indicative only and is not legal advice. Requirements depend on project size, location, state, activity and current regulation, which changes over time. We confirm exactly what applies to your site before any scope is agreed.
Tell us the project type, size, location and stage. We’ll confirm the approvals and ratings that apply within 24 hours.